Koka & Ergi Energy Stavec is registered in the National Registration Center (QKR) date 27.06.2008 with identification number (NUIS) K88027902J, represented by its legal administrator Mr. Mehmet Koka.
HPP “Stavec” is expected to be built in northern Albania in the south of the village Krasta, between the villages Blisht and Plan Bardhe. The purpose of its construction is the production of electricity by using the waters Mat’s river between quota 437 m and 350 m by a derivation in a length of about 4.43 km which traces on the left bank of the river.
Main indicators:
Type | With Derivation |
---|---|
Water level on the top side | 437 m |
Water level on the above side | 350 m |
Renja Bruto | 87 m |
Renja Neto | 80.4 m |
Prurja Llogaritese | 9.5 m3/s |
Fuqia e Instaluar | 6.8 Mw |
Energjia mesatare vjetore, E | 33.12 Gwh |
Energjia e prodhuar ne vitin e thate | 29.02 Gwh |
Energjia e prodhuar ne vitin e laget | 36.95 Gwh |
Ore pune ne vitin Mesatar | 5084 Ore |
Ore pune ne vitin e Thate | 4454 Ore |
Ore pune ne vitin e Laget | 5670 Ore |
Turbina tipi Frencis me Aks Horizontal | 2 cope |
Fuqia e turbines | 3.26 Mw |
Tubacione turbinash me diameter D=2100mm | 1 cope |
Water is taken in the village Blisht at the point where is expanded the gorge (several meters above the existing pedestrian bridge). The powerhouse is expected to be built on the left bank about 100 m below the point where streams the torrent of Plan Bardhe in Mat’s river.
HPP “Stavec” is under construction. Total estimated investment amount is approximately 8,000,000 euro.